Shawfield Grid Campus – Plot A
BMES recently completed the full Mechanical and Electrical installation at Shawfield Grid Campus (Plot A) for Clyde Gateway, as part of a major new development supporting business growth in the Glasgow region.
On the mechanical side, BMES installed domestic water services, sanitary ware, drainage, ventilation systems, air conditioning, and incoming water supplies with integrated leak detection and trace heating to ensure system resilience and compliance with modern building standards.
Delivered across a complex and multi-zoned site, the project required close coordination between trades and contractors. BMES worked collaboratively with Heron Bros to overcome logistical and design challenges, maintaining programme requirements and ensuring high standards of quality and safety.
The project was completed on time and to a high standard, providing Clyde Gateway with a fully serviced, future-proofed facility ready for occupation and ongoing use.
Clyde Gateway
ROLE:
Sub Contractor
CONSULTANT:
Wallace Whittle
CONTRACT VALUE:
£464,722.48
NATURE OF CONTRACT:
Mechanical & Electrical Services
CONTRACT DURATION:
12 weeks
YEAR:
2025